Robert Nunley

NICHOLASVILLE, Ky. - The Kentucky Transportation Cabinet has narrowed eight possible “zones” for the I-75 Connector project down to four. The studies, also referred to as “preliminary designs,” will be considered alongside a “No-Build” option.